Projects / Lobby Remodeling

LOCATION
2030 Main Street
Irvine, California

PROJECT OVERVIEW
The Wells Fargo Tower Project consisted of remodeling the elevator lobbies and the common area corridors on 6 floors. All the wood décor around the elevators was fabricated at Harline.
We installed all the new wall coverings and paint finishes. All on-site construction and installation was conducted after hours so that it would have no impact on the existing tenants and customers.

PROJECT INCLUDED
• Demolition
• Lighting
• Framing
• Drywall
• Staining
• Cabinetry
• Carpet